The Parking is developed for Sharjah Electricity & Water Authority Head Office . Plot is made including acitivities like Surveying, Earthworks, supply and installation of road base and interlocking pavement along with the thermostatic plastic paint in total
Area of 2,500sqm
Earthworks :-
Levelling and compaction of the Sub Grade Soil prior to the application of Road Base. Cutting and filling of soil to reach the desired level.
Road Base :-
Supply, Laying & compaction of 3000mm Thick crushed Road Base in Two layers.
The Plot is developed in Hamriyah Free Zone in which earthwork is done, large quantity of dune sand is removed and whole area is designed for easily flow of rain water. Application of 300mm thick RoadBase is applied with the compaction of 25ton roller.
Levelling and compaction of the Sub Grade Soil prior to the application of Road Base. Carting away extra soil after cutting and filling to reach the desired level.
Road Works :-
Supplying, Laying & Compaction of crushed Sub Base & Road Base in Two layers Area 11000sqm.
Asphalting :-
Spraying of bitumen Prime Coat (prior to Asphaltic Base Course) & Tack Coat( prior to Asphaltic Wearing Course) for the application of bitumen Asphalt in Two Layers with road making machines. Area 8000sqm
Interlock Pavement Parking:-
Supply & Installation of interlock pavement in Area 3000sqm for 38no’s of Car Parking.
The Port Parking is developed for the storage of the cars that are coming overseas through ships and distributed all over UAE. The parking is being made with underlaying electric cables with duct pipes for the street pole & CCTV services . Plot is made with supply and installation of road base and interlocking pavement along with the thermostatic plastic paint in total
Area of 40,000sqm
.Supply & Installation of 12m long and 3m Wide porta cabin for the Main Server Room. Rain Water Drainage is constructed throughout the plot for avoiding accumulation of water.
Construction of Industrial shed & office @ Hamriyah Free Zone. Zulal Water Plant Shed in Rehmaniya is fabricated along with the MEP services and with the construction of Mezzanine Floor for office.
Internal Road networks & Car Parking :-
Earthworks , Application Of 400mm Thick crushed Road base in Two layers with compaction of 25ton roller. Installation of road signages and application of road marking is also done in both road and Parking Area <br>